|
PAK building instructions, part III The Leg assembly
|
The
cleaning rod holders. I made the cleaning rod from a brass pipe (4 mm)
|
Here
you see the right leg with 2 cleaning rod holders. For exact position I
refer to the walkaround. |
Here the back cleaning rod holders. |
Here you see the little hooks (P08 for dim. ref.) which holds the rope that was used to pull the gun.
|
Here you see the little hooks attached to the leg |
And a detail shot. |
|