PAK building instructions, part III

The Leg assembly

 


The cleaning rod holders. I made the cleaning rod from a brass pipe (4 mm)
The holders are made of a beer tin (which was bend around the brass pipe and cut in half)
A little piece of plastic is glued at the end.

 


Here you see the right leg with 2 cleaning rod holders. For exact position I refer to the walkaround.
In front you see a ring which can be screwed in (dim. 10 x 3 mm)


Here the back cleaning rod holders.


Here you see the little hooks (P08 for dim. ref.) which holds the rope that was used to pull the gun.

 


Here you see the little hooks attached to the leg


And a detail shot.



Click here for part IV, The Cannon Assembly ....

 

 


Back to PAK Index page